Quote templates and
real worked examples.

Two real priced bills of quantities, measured line by line from actual architect's drawings — not illustrations, not filled-in samples. Download the quote and the full bill of quantities for each. No email, no sign-up.

Worked examples01

Two real jobs,
priced line by line.

Single-storey rear extension
£128,296.04

A full-width single-storey rear extension with a flat roof and lantern, a side extension housing a utility room and cloakroom WC, and a new entrance porch — priced to a plastered shell with electrics and plumbing throughout.

99 priced lines · Surrey · measured from the drawings

See the example →

Main-roof loft conversion with rear outrigger extension
£70,317.93

A main-roof loft conversion with dormer windows and rooflights plus a rear outrigger extension, priced to a fully-plastered finish with the engineer's beam scheme carried through.

62 priced lines · Surrey · measured from the drawings

See the example →
Why it matters02

A lump sum is a guess
nobody can check.

Most quotes a homeowner receives are a handful of round numbers against vague headings. They can't be compared with a rival quote, they can't be defended when the client asks why, and they give you nothing to price a variation against when the job changes. A measured quote carries a quantity, a unit and a rate on every line — so when the scope moves, the price moves with it, visibly. More on how a bill of quantities works →

Blank templates03

A blank one
that does the adding up.

Eleven sections, a dropdown of standard tasks on every line, and the arithmetic already wired in. Free, no email — the only thing we ask is that you leave the small QuoteWise line in the footer.

It adds up by
itself

Type a quantity and a rate; the line total, all eleven section subtotals, the tender sum and the VAT calculate themselves. Nothing to re-add when the scope changes.

175 standard tasks to pick
from

Every description column is a dropdown scoped to that section — and the wording comes from real priced jobs, not a generic list someone wrote from memory.

The exclusions already
written

Party wall awards, planning and Building Regulations fees, unforeseen ground conditions, asbestos. The lines that cause arguments, pre-drafted for you to keep or cut.

Rather not fill one in
yourself?

Send us the drawings and we'll produce the priced bill for you. Your first three quotes are free.